Quote:
Originally Posted by Tempest67
Thanks Guys, and no, just me puttering away at it when I can (weekends and some evenings)
I brought the car home in late October, took the driveline out and started the metalwork in November. So 3 months to do the inner and outer rockers and 1/2 the floor. Is that fast?
It's dirty work, but so far I have been enjoying the challenge.
Lots more metalwork to go, but's that why I purchased the car, I wanted a project.
Stay tuned for the Driver's side (it's in worse shape)
|
I scrolled back through and didn't find it: can you describe your weld set up?
Model, settings, wire, etc.
Thanks,
K