Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
|
08-08-2024, 02:40 AM | #1 |
Registered User
Join Date: Dec 2017
Location: Elkhart, Texas
Posts: 1,817
|
Re: 67 C10 steel bedside install question
Bed sides are on top of floor. Bed front panel is below floor. The small "L" brackets on the rear corner posts are on top of floor. Wheel "tubs" go in last.
That black E-coat isn't very durable, and will soon rust.. Scuff and apply epoxy primer to all the contact areas before assembly. |
Bookmarks |
|
|