Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
03-07-2005, 06:48 PM | #1 |
OBS guy
Join Date: Jun 2004
Location: SoCal
Posts: 1,060
|
The final push... Deadline is Friday.
K5 is nearing it's completion after about 4 months! Had a busy weekend. Have an appt at the exhaust shop Friday. Should be fun since I am driving about 13 miles with open headers!
DONE 6" Springs 2" Rear Blocks Ball Joints Tie Rod Ends Drag Link Steering Arm Rebuilt Carter 650 Rem RH Exh manifold Finished building front RH side- (bearings, brakes, etc) Needs to be done by friday- HEI Distributor, plugs & wires Rem LH Exh manifold Bolt on headers Finish building front LH side bleed brakes Dual steering stabilizer Figure out how the HELL I am going to get it out of the garage Should be no problem. Oh, and next time I say the truck is going into the garage for some work, shoot me. Some of the most physically exhausting work I have done on a truck.
__________________
88 Suburban Goodies- Alpine, Auto Meter, BDS, Bilstein, B&M, BFG, Borgeson, Bushwhacker, Cowl hood, Flowmaster, Genuine Gear, Holley, Infinity, JVC, K&N, MB Wheels, MSD, Pioneer, Skyjacker, Sony, Thorley, Walker + more |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|