Welp, this is what ive been working on lately. Everything is coming together nicely. I put in my order for my York210 for some crazy fast onboard air and hopefully Ill have that in by next week sometime and then I can start the real fun. Actually installing the bags.
Heres some shots of the tank, gauges and Solenoids, I still need to soldier and loom the solenoids but you get the idea. And for the tank, I want to keep the bed as clean looking as possible with the tanks in there, so thats why I mounted the solenoids under the cab.
And I apparently have a really fricking small slow leak going on between the tank and valves, so I have to go get the windex out and track that down today, other than that. Everything is coming along tip top!