The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1973 - 1987 Chevrolet & GMC Squarebody Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 10-27-2008, 02:00 PM   #20
tgh117
Crazy
 
tgh117's Avatar
 
Join Date: Apr 2005
Location: Emmaus, Pa
Posts: 203
Re: What did you get done? 10/26

I managed to get the painted cab back to my house Fri night from my dad's, where it has been sitting for the last 3 or 4 months since he painted it. Got it moved onto the frame saturday morning before had to go to a wedding, then yesterday got the whole bottom of it painted with Por-15, cut the whole in the floor to drop my 4x4 hump on it, and got all the bed floor members, gas tank, and straps, lift springs, and all the misc pieces painted up to start the reinstall on the truck. Bed is also all painted, and just needs to get back to one piece soon. Was a rather productive weekend for what little time I spent in the garage.

Here are some teasers
Attached Images
   
__________________
77 SB Stepside in a bunch of pieces scattered around the garage.
tgh117 is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:46 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com