Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
12-18-2009, 02:20 AM | #1 |
Registered User
Join Date: Oct 2009
Location: Panama City Beach, FL
Posts: 228
|
1st Project: 71 C10 SWB
This is my first project of this size. Two months into the disassembly of my 71 C10. Current plans are for a 95 LT1, 700R4, four wheel disks, 2.5"/4" drop, air conditioning, rear fuel tank. Here are a few pics of the before and during the disassembly. The Cab will be removed this weekend and start wire-wheeling the frame. Timeline for the project is around 18-24 months, may be wishful thinking. Thanks for the great info I have found on this site.
|
Bookmarks |
Thread Tools | |
Display Modes | |
|
|