![]() |
Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
![]() |
#11 |
Registered User
Join Date: Jul 2011
Location: Des Moines, Iowa
Posts: 3,016
|
Re: Project "My Happy Mess"
![]() ![]() Installing the intake - ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Tackeling the (front) frame before dropping the block/transmission (after lines). Proper breathing apparatus and ventilation used and recommended. Coat 1 complete, moving onto the 2nd coating - ![]() ![]() ![]() ![]() ![]() ![]() ![]() Finished. Will hit the underside with rubber in a can before engine/transmission. Real quick... Pan/transmission before - ![]() ![]() After - First coat Zero Rust Red for oil pan (second coat will be a black of a different product) - ![]() Cast ![]() ![]() ![]() south side! ![]()
__________________
project: "my happy mess" Last edited by litew8; 10-16-2011 at 02:47 AM. |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|