Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
03-27-2013, 02:27 PM | #11 |
Account Suspended
Join Date: Oct 2012
Location: here
Posts: 2,408
|
Re: The Official John Lee Jr Thread
Big Easter weekend planned for John Lee Jr. Title if the flood paperwork arrives in time and a test ride then. Whether or not here's the initial list. We'll see how much I get done.
- Reattach DS window to riser Done - Lube vent window pivots Done - Install Brake Drums Done - Adjust Brakes Done - Install Radiator Cap Done - Install Radiator overflow tank Done - Install new rubber fuel lines Not needed - Tweek seating of inside lip of windshield gasket at Driver side piller Done - Install passenger side visor Done - Install interior rear view mirror and remove modern glass mounted replacment Done - Fix Passenger side front TS and park lamp - Fix license plate lamp - Fix passenger side rear running lamp, dim bulb - Wash truck - Clean firewall and inner fenders - Lube supsension Done - Lube u-joints - Oil change with zddp - Run engine 30 minutes at 2K RPM for cam break in (don't know how this engine was started but with only 200 miles, can't hurt) - Hard pull engine in 2nd 15 times if tagged/titled in time (seat rings and pistons/cylinder walls) - Commence 500 miles to another oil/filter change easy run in - Adjust fan belt - Check timeing and carb settings hot - Check coolant sensor and lights, repair as needed If I get all that done including tags, betcha I get 150 miles between Friday and Monday! Last edited by Sharps40; 04-01-2013 at 07:54 AM. |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|