The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1960 - 1966 Chevrolet & GMC Pickups Message Board > projects and builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-27-2014, 10:34 PM   #11
bubba327
HOW long until spring??
 
bubba327's Avatar
 
Join Date: Mar 2009
Location: Star Idaho
Posts: 1,413
Re: Bubba's recycling project

Name:  IMG_4169.jpg
Views: 798
Size:  44.0 KB
The manifolds are all painted up and I have the collectors ready with first bends fit and cut and the crossover balance pipe built.
The cross over will be at the transmission brace just past the trans oil pan. and will be 1" below frame measured to the top of pipe.
I read a lot of ideas online about where the H pipe should be but that is where it ended up fitting best.
Just need to get the manifolds bolted back on and can start to make things permanent .
I need to pick up a pair O2 sensor bungs to weld in just in case I find a wide band to help with the set up and tuning.
The manifolds I am using are 67-68 Chevy truck 283-327 on the right side, And the left is 65-68 passenger car and truck 283-307-327. so I guess they are kinda correct for the year and kinda match.
__________________
69 chevelle convertible
71-C-10 short-wide and low
64 C-10 custom shortbox "Bubba"s Recycling project"
bubba327 is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:56 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com