The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 05-15-2014, 12:06 PM   #1
White70C20
Registered User
 
White70C20's Avatar
 
Join Date: Oct 2012
Location: Kansas and Iowa
Posts: 349
Preping a rebuilt engine for storage.

Hello all,

I recently finished rebuilding the 250 inline 6 out of my grandfather's '70 C20. I am going home over the summer, and I don't have time to completely install the engine back into the truck before I leave. I was wondering if anyone had ideas/recommendations on how I should prep the engine for storage. The engine hasn't run since it was rebuilt.

Thanks!!!
__________________
White70C20

1970 Blue C20 - 250, 4 speed
1985 Ford Thunderbird
2005 Pontiac G6
White70C20 is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:19 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com