The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-27-2004, 01:36 PM   #1
Custom 68
Registered User
 
Custom 68's Avatar
 
Join Date: Nov 2001
Location: Springfield, MO
Posts: 2,929
painting minimum temperatures

I had been working just as fast as possible well living here in the great state of Missouri I missed painting this fall cause the temps dropped. Well I am ready and waiting the warm weather.
This week it is supposed to be 60 - 65 outside temp. I can heat my shop up above that but will need to open the doors to exhaust the air as I am painting. the temp wont stay or be at this outside temp very long. Once complete and aired out I can close shop and fire up the heater again and get it nice and warm.
Should I wait till spring or chance it. I have worked very very hard to this point
Thanks
Dave
__________________
Dave
1968 Custom Chevy with turbo charged 5.3 gen III 4l80e swap
1967-71 GMC 3/4 ton long step 4x4 (not sure what year exactly?)
"A good friend will bail you out of jail...but a true friend will be sitting next to you saying "that was frekin awesome".
"If it doesn't fit force it...If it breaks then it needed to be replaced anyway!"
Custom 68 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:17 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com