The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 11-26-2006, 07:03 PM   #11
Rokcrln
Senior Member
 
Rokcrln's Avatar
 
Join Date: Jul 2005
Location: Winters Ca. 95694
Posts: 4,843
Re: Project: Slow Build

Well I had some time today with the rain to get out into the shop but I was told Holiday weekends are family time so get to work on our truck Gotta luv her!

Anyways I finished up the rockers and cab corners, welded up all the old holes in the floor as well as finishing up welding the body drop cuts. Then I built my trany tunnel for clearance of my drivshaft at full drop as well as my crossmember clearance issue. Here are a few pics. Now I can try out some different seam sealers and paint/undercoat the bottom of the cab and move on to the fire wall on the next holiday weekend

Kevin
LFD Inc.
Attached Images
     
Rokcrln is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 06:37 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com