The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 08-09-2007, 11:52 PM   #1
dan42
Registered User
 
dan42's Avatar
 
Join Date: Feb 2007
Location: Cali Central Coast
Posts: 5,191
Dive shaft length on lowered truck

Got a question. On my '67, I'm gonna swap the motor and tranny out (probably a 383 stroker and and a th350) but I was wondering on how to measure for a new driveshaft. Do I lower it before I put the motor in, or after, and then measure for the drive shaft? I want to put a one piece in. Are there preset measurements? Not sure if I am gonna use a long shaft or a short shaft tranny. Preferably, I would like to put everything in at the same time, not have to put the motor and tranny in, then measure. Any advise would be appreciated.
__________________
'67 SWB Fleetside ZZ4/350/Tremec 5-speed/4link/Scott's IFS - and fun as heck! SOLD
Click here to support the board
Philippians 4: 6-7
dan42 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:34 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com