The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-13-2009, 09:29 AM   #1
jwmdnm
Registered User
 
jwmdnm's Avatar
 
Join Date: Nov 2008
Location: Robbinsville, NC
Posts: 38
Correct sequence for ball joint replacement

I'm replacing the ball joints on my '67 Stepside Shortie. Any advice about the correct sequence for removing (and replacing) the upper and lower ball joints? I see the upper ball joint nut, the two bolts through the brake backing plate to the steering mechanism and the nut to the lower ball joint.

Also any advice about how to lower the lower arm without having the coil spring come out with possible consequences to me or the truck?

Any help and suggestions would be greatly appreciated.

Thanks in advance.

Jim
jwmdnm is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:59 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com