The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board > 67-72 Chevrolet & GMC Pickups Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-04-2009, 10:00 PM   #23
bmeredith
beer 1st, work 2nd
 
bmeredith's Avatar
 
Join Date: Jun 2008
Location: Sacramento, CA
Posts: 78
Re: 72 chevy short fleetside, DM front, 3-link rear. Pics

was able to change out my cam bearings a few days ago so i put the top end back together. ran into a snag adjusting the rocker arms though, some research has shown: tighten adj. nut until no up and down movement from lifter rod; then, tighten an additional 3/4-1 1/2 turn. at TDC #1, i adjusted the valves per my Haynes book's instructions. i tightened until no lash from lifter rod, but then any further tightening starts opening the valve. i imagine that i want those to stay closed. so why does it say tighten 3/4 to 1 1/2 after you've reached no lifter lash? Fyi, i could tell the valves were opening looking through the exhaust ports at the exhuast valves and yes, i was adj. the correct rockers. the are World S/R heads, don't know anything more about them. There is probably 1000 miles on them

anyways, the good stuff:

Last edited by bmeredith; 07-27-2010 at 12:07 AM.
bmeredith is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:00 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com