05-17-2010, 08:01 AM | #9 |
Under Construction
Join Date: Oct 2007
Location: Midlothian,TX (DFW)
Posts: 4,555
|
Re: Project Slo-Go 67
Well after alot of routing wires etc, we mounted the battery box and temporarily mounted a battery. I told my son that the truck would start if we installed the distributor, and spark plug wires, he looked at me with a HUGE grin!, so to prove my point, I told him we could turn it over for a second to see if i did the wiring correctly to this point Below is the outcome....
we still need to complete the wiring but we are taking our time . we should be able to start routing wires for the lights etc. soon i hope.....
__________________
Heath subscribe to the board here: http://67-72chevytrucks.com/vboard/payments.php http://67-72chevytrucks.com/vboard/s...d.php?t=157669 FAQ how to's 1956 Chevy Apache 1967 C10 SWB FleetSide (under construction) 1969 K10 SWB FleetSide (Future Build) 1972 C10 SWB Stepside (Future Build) 56 chevy truck : http://www.cardomain.com/ride/2955823/1 67 truck build: http://www.67-72chevytrucks.com/vboard/showthread.php?t=281357/1 69 k10: http://67-72chevytrucks.com/vboard/s...d.php?t=389470 Last edited by my67chevytruck; 05-17-2010 at 08:03 AM. |
Bookmarks |
|
|