Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
01-17-2013, 10:39 PM | #10 |
Registered User
Join Date: Dec 2012
Location: Allen, TX
Posts: 519
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
The frame will be hell for stout the way you're doing it. Help me out in case I ever do one though---what would be wrong with a horizontal 2" sectioning of the stock frame? By the time it's welded full length, fishplated as necessary, and boxed, and maybe partially doubled, it seems like that would stiffen it up enough. (2" assuming you can get the 3/4" more you need out of body mount drop)
JK
__________________
JK |
Bookmarks |
|
|