Re: Project "Blackbeard" 69 C-10
Today I was able to get the March pulleys on the motor, cut out the old manual transmission crossmember, and place a compressor/tank bracket. The new trans will be ready Monday. Too bad I work on monday. I wont be able to touch my truck till Tuesday. Soon as the trans is in, I will be able to get the truck back together and up and running again. Phase 1 of the build will be mostly done. Phase 2 will be some time in the summer most likely. I will add a vintage air before summer. It's too hot out here in Vegas.
|