Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
02-27-2015, 09:54 AM | #20 |
Registered User
Join Date: Dec 2014
Location: Paint Bank, VA
Posts: 209
|
Re: Project "Moonshiner" Bagged & Z Frame 63
I'm mocking up stuff now. I have some Schedule-80 4" pipe I'm using.
Lots of trial and error tacks, install, uninstall, repeat. I think I have the right spot now. Upper and lowers extended 2" The camber isn't as bad as it looks here. For some reason the camera kind of extorts it. I put a laser on it and the camber is only off 2 degrees and this is at it's lowest point. I haven't measured at ride height but I think it will be real close.
__________________
____________________________________________ My build thread: Project Moonshiner Bagged & Z Frame 63 http://67-72chevytrucks.com/vboard/s...d.php?t=659205 "I love the smell of grinding metal" |
Bookmarks |
|
|