The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1973 - 1987 Chevrolet & GMC Squarebody Pickups Message Board > Squarebody Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 01-08-2016, 09:52 PM   #11
75Dually
Registered User
 
75Dually's Avatar
 
Join Date: Nov 2013
Location: Lubbock, TX
Posts: 769
Re: 75 Dually build

The hydro boost is now done! Ok I still have to bleed the brakes, but hey it's mostly done!! Yes the brake lines need the bends to be cleaned up, and all that wiring needs to be cleaned up as well. The underside of the engine bay really needs some attention.

I was so glad to have the OEM lines from Napa. They made this so much easier and cleaner. I also did the spark plugs on this side of the motor because the brake system was out of the way. Talk about a knuckle buster with all that stuff in the way... I will get the other side done tomorrow, we are now getting freezing rain and more snow on the way. Yeah!
Attached Images
 
75Dually is offline   Reply With Quote
 

Bookmarks

Tags
air bags, alcoas, chevy, dually, lowered


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:15 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com