The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1947 - 1959 Chevrolet & GMC Pickups Message Board > Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 12-28-2016, 10:28 PM   #11
Advanced Design
Senior Member
 
Advanced Design's Avatar
 
Join Date: Jul 2012
Location: Oblong, Illinois
Posts: 7,028
Re: 48 Burb, bagged, 5.3, 20 year wait

The solution for the contact between the pinion stub shaft U-joint and the cross member is to notch the cross member with a pipe notch. Cut out here, it will be finished when I take the powertrain out again.

Steering almost worked with only two u-joints though it needed three to clear the frame and exhaust header. I still need to do the stake procedure per Borgenson directions and this part is done. Their parts are pricey and worth it...don't cheap out on steering.

Next up is mounting the brake pedal assembly bracket...marked out here from fitting.

Decided to take a look at that again tomorrow to verify accuracy before drilling holes in the firewall. Really don't want to do that wrong....

Oh, check out the light my new Snap On LED puts out. Wow, under dash is now as bright as shop floor. And the light isn't hot.
Attached Images
     
Advanced Design is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 02:08 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com