09-25-2017, 02:56 PM | #1 |
Registered User
Join Date: Apr 2017
Location: Sacramento, CA
Posts: 53
|
Air ride almost done!
Well, it took a few rookies with no experience and four days (two weekends) to complete the rivet removal, fabrication ETC for the rear end. The drop spindles are installed in the front and both travel tanks have been unbolted from the bed (without a break!). Need to do the shocks and bags up front still. None of us had welded, plasma cut or have tackled such an adventure. Many thanks to the direct messages and all the threads and knowledge here. Air management setup is next, we'll see how long that takes.
__________________
-71 C10 long bed, 402 -91 Camaro Z28, B2L 350 -96 Tahoe 2 door 2wd -15 Tahoe LT -16 Lexus RC 350 F sport |
Bookmarks |
|
|