The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1947 - 1959 Chevrolet & GMC Pickups Message Board > Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-26-2020, 07:43 PM   #33
56hotrodred
Registered User
 
Join Date: Aug 2007
Location: Mountain View, Alberta, Canada
Posts: 415
Re: 56 task force on 80 1/2 ton frame pictures

So I am heading home on Saturday a little bit early as we are expecting our first grandchild! My wife thinks she needs to be around for that and I kind of agree.

In any case while she is up helping with the new baby I am going to have some free time to maybe get the truck fired up for the first time.

What I was wondering: Is there any procedure(s) that I should follow before/after even installing a battery and fuel along with the rest of the fluids?

I am going to prime the engine.

I guess I will need to get a driveshaft built and install so I don't loose all my transmission fluid when I fill it up.

I have never done this complete a rebuild with pretty much everything being new including the engine, transmission rear end and of course the complete AAW wiring harness and Ron Frances Ramjet engine harness.

Any thoughts or recommendations would be greatly appreciated.

Thanks in advance.

Barry
56hotrodred is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:49 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright 1997-2025 67-72chevytrucks.com