![]() |
Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
![]() |
#11 |
Senior Member
Join Date: Aug 2005
Location: tulsa OK
Posts: 3,070
|
Re: project INCREDIBLE HULK
powerwashed the frame to keep my hands and the new parts from getting dirty during mock-up.. tore-off the front and rear suspension and got the bags (all 4 corners) installed, drilled the bag mounting plates for the front, installed the lower tubular control arms, located and drilled the shock mounts, and finally assembled it all for mock-up (less the muscle-bar sway bar)
![]() ![]() ![]() ![]() |
![]() |
![]() |
Bookmarks |
Thread Tools | |
Display Modes | |
|
|