The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board > 67-72 Chevrolet & GMC Pickups Projects and Builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 10-04-2009, 09:38 AM   #11
68 short step
Senior Member
 
Join Date: Aug 2005
Location: tulsa OK
Posts: 3,070
Re: project BIG RED (gen3 on air)

switched from the rust repair to the suspension, i ran 3/8 hardlines from my valves to the bags...i used bulkhead fittings to go through the front crossmember, kinda under the engine perch, to connect the front bags... same with the valves, i used a 't' bulkhead fitting to connect the valves to the tank through a rear xmember... also im gonna move the location of the tank (mounted under the bed infront of the rear tire, on the ouside frame rail) im gonna move it to under the bed, where the spare tire would go, simply because it would save me time with the line to connect the tank with the valves, and also it will make it easier to maintance should something go wrong with the system....







68 short step is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:06 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2025, vBulletin Solutions Inc.
Copyright 1997-2025 67-72chevytrucks.com