The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > General Truck Forums > Engine & Drivetrain

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 10-09-2014, 08:47 PM   #11
clinebarger
Senior Member
 
Join Date: May 2009
Location: Fort Worth, TX
Posts: 6,370
Re: 700R4 build thread.

Time to Install the Valve Body.

Install the Manual Link Rod as shown in the picture below.

Hand tighten the 1-2 Accumulator Housing & Auxiliary Valve body bolts.

Remove the Z-Bolt alignment stud that is closest to the shifter Comb.....It gets in the way of installing the Valve Body.

You may need help holding the Valve Body over the Case to start the Manual Link Rod into the Manual Shift Valve.

Center the Valve Body over the remaining Z-Hole alignment Stud, Slowly lower the Valve Body onto the Separator Plate Gasket.

**NOTE, Before sitting the Valve Body all the way down...Make Sure no Checkball has fallen onto the Separator Plate, You can usually hear them drop, But still check**

Start the Z-Hole Valve Body Bolt First!

Install the Forward Accumulator Feed Pipe if equipped.

Start the rest of the Valve Body bolts, Be aware of the Brackets & Hold down locations in the Pic below.

I do the TV Actuator Assembly last along with removing the other Alignment stud
Attached Images
  
clinebarger is offline   Reply With Quote
 

Bookmarks

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:01 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright 1997-2025 67-72chevytrucks.com