Finally got my parts from my local fab guy. He works cheap.....and the quality is top notch, but speed is not his forte.
The parts allowed me to complete my dehumping of the stock S-10 lower control arms. Got one done last night. Pretty straight forward project.
After these are done I can mock up the front bags and make my upper bag cup.
I received my tracking number for my rear knuckles. Scheduled to arrive Friday. With any luck I will be back to a roller this weekend!!
- Finish LCA's
- mockup front bags
- install rear knuckles
- install rear bags
- Temp air lines for air ride!!!
- install SBC and mock up Rack and Pinion
- SBC back out, install heads, paint etc!!