![]() |
Register or Log In To remove these advertisements. |
|
|
|
|||||||
![]() |
|
|
Thread Tools | Display Modes |
|
|
|
|
#1 |
|
Proprietor of Dale's Corner
![]() Join Date: Nov 2012
Location: Vacaville , CA
Posts: 16,866
|
Re: How have you paid for your shop?
Awesome! I hope everything comes together smoothly.
__________________
"Some Days Chickens And Some Days Feathers" Dale XNGH ECV Sam Brannan 1004 R.I.P. 67ChevyRedneck R.I.P. Grumpy Old Man R.I.P. FleetsidePaul |
|
|
|
|
|
#2 |
|
Post Whore
![]() ![]() Join Date: Sep 2008
Location: Harrison, Arkansas
Posts: 10,018
|
Re: How have you paid for your shop?
Why not pour a concrete stem wall to a foot above grade on the right side (looking from front) and rear and maybe along the drive a few feet.
My shop here is 6' underground on the rear side. I put a stem wall all the way around so I could wash it out and not worry about damaging anything. I have a similar situation to yours at my house, and when I build there I'm going to do a stem wall and backfill to grade. At my house the back wall will be 6 to eight feet underground.
__________________
other Larry Build thread, Arkansas K10 https://67-72chevytrucks.com/vboard/...=755797&page=5 The ability to speak several languages is an asset, but the ability to keep your mouth shut in any language is priceless. |
|
|
|
![]() |
| Bookmarks |
| Thread Tools | |
| Display Modes | |
|
|