The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1960 - 1966 Chevrolet & GMC Pickups Message Board > projects and builds

Web 67-72chevytrucks.com


Reply
 
Thread Tools Display Modes
Old 11-10-2014, 09:16 AM   #1
4mulaSvaliant
Registered User
 
4mulaSvaliant's Avatar
 
Join Date: Oct 2014
Location: VIRGINIA BEACH
Posts: 140
Managed to get a few things wrapped up this weekend!

She runs again!!!!!!!!!!!!

So I managed to get a few things done and am slowly chiseling away at the "TO-DO" list.


Got done:
New fuel line from tank to pump, and pump to carb.
New fuel filters
New fuel pump
Proportioning valve
Brake lines (front)




To do:
Install new E-brake cables (SWB brand new from In-lint tube) (Screw them by the way!) Ill tell that story in a bit.
Tie rod ends
Bleed brakes
Install tail lights in fenders


Random other "to-do's"
new Gauges
Heater motor
Radio
Check headlight wiring (one dim headlight)
install a bed floor
Tune up
Trans tail shaft seal (should have already done it but....)
Find a place to connect the crank case breather tube on my new air cleaner
Electric choke (make it work)
4mulaSvaliant is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:08 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com