The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1947 - 1959 Chevrolet & GMC Pickups Message Board > Projects and Builds

Web 67-72chevytrucks.com


Reply
 
Thread Tools Display Modes
Old 06-16-2016, 08:57 AM   #351
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Quote:
Originally Posted by lower50's View Post
Happy Birthday

_i_i_i_i_i_i_i_i_i_
{.........................}
{--------------------}

It's a birthday cake!? lol
That "cake" and your confusion over whether it actually was one just sent some coffee flying

II Slow awesome cars love the fox body pic can't say we will be anywhere near your speed but I have a grudge match against a buddies cuda I don't plan to lose
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-16-2016, 09:04 AM   #352
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Oh boy page 15

Heres another picture of the stroker 1.6 roller rockers
Attached Images
 
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-16-2016, 10:57 AM   #353
ptc
Registered User
 
ptc's Avatar
 
Join Date: Mar 2015
Location: Morada, CA --- (Near Lodi)
Posts: 1,443
Re: Project Orange Crush (57 3100)

Quote:
Originally Posted by Valarius_Starchaser View Post
Here's a picture for you too. I can't help but wish the Nova was put on hold for my truck though but that's how things go I suppose fathers projects take precedence over sons
Well especially since its FATHERS DAY weekend..... We get special attention at least 1 time a YEAR!!!!

Enjoy!!!
__________________
My Build: 57 Chevy Pro-Street
ptc is offline   Reply With Quote
Old 06-17-2016, 11:47 AM   #354
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Fair enough PTC

couple more pictures got the mouse in the nova and now we have a rat to tear into for his 67 elco we have the city on our butts so all three need to be running before the end of the month

This is another 454 with the same 781 heads no head work done stock rotating assembly only 60k on it though throwing a mild cam and some bearings at it along with a good cleaning should make some quality low end torque got it all stripped and cleaned/bagged last night WORK WORK WORK WORK
Attached Images
    
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-20-2016, 09:16 AM   #355
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

fellas I have entered wiring HELL

This is the stock harness from a 95 1500 4wd with a 4L60E that I picked up to strip down and convert into a trans controller for my 4L80E the connectors are the same for the two units but there is a few wires that need deleted and some that need moved nothing to bad as there is plenty of diagrams available

Name:  IMG_2501.jpg
Views: 315
Size:  62.9 KB
Melting the pass through goo off the wires
Name:  IMG_2502.jpg
Views: 325
Size:  57.9 KB
AHHHHHHH
Name:  IMG_2505.jpg
Views: 337
Size:  57.4 KB
trans connector
Name:  IMG_2507.jpg
Views: 334
Size:  71.6 KB

Name:  IMG_2508.jpg
Views: 337
Size:  52.0 KB
PCM connectors
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-20-2016, 09:22 AM   #356
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Name:  IMG_2520.jpg
Views: 331
Size:  58.7 KB
Trans end all done and loomed
Name:  IMG_2523.jpg
Views: 350
Size:  49.1 KB
This is likely more wires then a stock truck would have had total
Name:  IMG_2511.jpg
Views: 335
Size:  44.3 KB
Jeep steering shaft to solve my steering angle issue (I need to get a new gearbox to make this work unfortunately
Name:  IMG_2524.JPG
Views: 342
Size:  81.9 KB
Dropped the cluster in
Name:  IMG_2529.jpg
Views: 332
Size:  48.1 KB
Steering column in man the inside of my truck is a hot mess
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-20-2016, 10:19 AM   #357
II_Slow
Registered User
 
II_Slow's Avatar
 
Join Date: Jan 2012
Location: Celeste, Tx
Posts: 266
Re: Project Orange Crush (57 3100)

You and me both!


Mine is about 40% complete, but I went with the Guard Dawg keyless ignition system and I can't get it to play nice. I'm convinced it is defective, and their tech support is convinced I have something wired wrong. Time will tell!

I'm not at all worried about the wiring. I'm an electrical engineer so it's not an issue all for me, but I can see where completely wiring a project from scratch could be hugely intimadating to someone with very little knowledge or training on this stuff (not saying you - just generalizing). Sometimes you think you know how something works, until you try to wire it up. Stuff like how the blinker/brake lights circuit really works, how the control circuit works that cycles the A/C compressor and triggers the electric fan to run, how the wipers return to the park position, in my case how the overdrive and lock-up circuits work, etc.

My biggest issues with the wiring act more with the mechanical side of it than electrical - how to feed the circuits through the firewall, what connectors to use, where to locate the terminal blocks, etc. It's so crowded under the dash and ackward to get to. Just do everthing you can off the truck and solder all of the connections. Avoid crimped fittings anywhere you can.
__________________
1955 SB Stepside 3100 big window cab on a 99 Ram 2500 Frame w/ 12-V Cummins diesel power and
47RH AOD transmission
http://67-72chevytrucks.com/vboard/s...d.php?t=640042
II_Slow is offline   Reply With Quote
Old 06-20-2016, 12:03 PM   #358
Kim57
Registered User
 
Kim57's Avatar
 
Join Date: Aug 2007
Location: Corona, California
Posts: 7,998
Re: Project Orange Crush (57 3100)

Looks very confusing.
I don't have the courage to do that.
Kim
__________________
My build thread
http://67-72chevytrucks.com/vboard/s...d.php?t=283107
Kim57 is offline   Reply With Quote
Old 06-20-2016, 12:06 PM   #359
ptc
Registered User
 
ptc's Avatar
 
Join Date: Mar 2015
Location: Morada, CA --- (Near Lodi)
Posts: 1,443
Re: Project Orange Crush (57 3100)

Quote:
Originally Posted by II_Slow View Post
You and me both!

I'm not at all worried about the wiring. I'm an electrical engineer so it's not an issue all for me, but I can see where completely wiring a project from scratch could be hugely intimadating to someone with very little knowledge or training on this stuff (not saying you - just generalizing).
Good to know WE ALL got an (EE) engineer in the house now for some electrical help when needed.... !!!

Ive been doing electrical for 30+ years but there are still those times when you are trying to make one ELEC thing work with another ELEC thingy and they dont like each other....

TTYL!


Looking GOOD VAL!!!! keep it up!
__________________
My Build: 57 Chevy Pro-Street
ptc is offline   Reply With Quote
Old 06-20-2016, 12:36 PM   #360
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Glad you guys are so confident my head is hurting just figuring my ignition system with the neutral safety switch setup
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-20-2016, 01:30 PM   #361
ptc
Registered User
 
ptc's Avatar
 
Join Date: Mar 2015
Location: Morada, CA --- (Near Lodi)
Posts: 1,443
Re: Project Orange Crush (57 3100)

Quote:
Originally Posted by Valarius_Starchaser View Post
Glad you guys are so confident my head is hurting just figuring my ignition system with the neutral safety switch setup
Since you are doing it from a pretty basic starting point you should make a line diagram of each wire by color and number them with the tape on numbers and that way you know what has been completed. at the end you'll have a complete 1-line diagram of YOUR TRUCK for any troubleshooting you may have to do in the future. (see attached example)

Attached Images
 
__________________
My Build: 57 Chevy Pro-Street
ptc is offline   Reply With Quote
Old 06-21-2016, 01:13 AM   #362
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

More progress on the harness tonight soldered a ton of splices and crimped terminal ends on for all the HEI and ignition switch connectors as well as the starter solenoid stuff.

Really not far from firing this thing up need radiator mounted and filled and some exhaust hung I did see that my intake has a large hole in the front china wall where I didn't get enough gasket maker DOH so tear that off again set base timing and give her hell for break in how many gallons you think this thirst girl will need to run for 30 minutes at 2000RPM?

Also what weight oil is really recommended looking at a lot of guys saying the most expensive SAE30 you can find and some say the cheapest not sure what to do on this because it all gets thrown out after first break in anyhow

what do you all think I should run for an inline BAT+ to fuse block Main Fuse I have some 45s laying around from the Nova but I don't know if that is large enough to run the PCM,DRAC and all the lights with a prospected heater and stereo in the future nay thoughts? 80A?

Sorry no real picture worthy progress gentlemen just a wall of text
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-21-2016, 03:19 AM   #363
lower50's
Registered User
 
lower50's's Avatar
 
Join Date: Oct 2014
Location: Kitchener, Ontario, Canada
Posts: 3,254
Re: Project Orange Crush (57 3100)

Oh I hate when Electrical thingy's don't like each other!!
5 Gallons? lol
I go with cheap oil 5W30 when I put my motors back together. But what ever you are comfortable using.
I have a 100A circuit breaker on my Jeep never had a prob I would go with 80A.
__________________
http://67-72chevytrucks.com/vboard/s...d.php?t=648459
https://67-72chevytrucks.com/vboard/...d.php?t=769441
1951 MG TD
1967 Jeep CJ5 1.9L TDI 33X13.5X15 Mud Grapplers.
1952 GMC 9700 p/u 7.3L diesel on air, dually
lower50's is offline   Reply With Quote
Old 06-21-2016, 09:42 AM   #364
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Quote:
Originally Posted by lower50's View Post
5 Gallons? lol
To much? not enough? I really just plain don't know only V8 car/truck this hopped up I've driven is the Nova and thats a small block so no comparison I'm sure
__________________
"Orange Crush"

Last edited by Valarius_Starchaser; 06-21-2016 at 04:53 PM.
Valarius_Starchaser is offline   Reply With Quote
Old 06-22-2016, 12:30 AM   #365
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Man oh man gentlemen I am on a downhill run with this motor I installed the pistons upside down fixed that and had to reseal my intake again (which I did tonight) went to find TDC to set my distributor in and I'm having a hard time being confident with how I put the timing chain in I feel like I put it in 180 degrees off not thinking its a tooth off or anything just backwards as in both timing marks pointing upward

Anyone have a way to confirm if it was set up correct without taking the whole front cover off? My thought is this

The intake valve will only open once (at TDC) or near it anyhow correct? so if the intake valve begins to open and the piston at that point is near TDC and then shortly begins to fall as the intake valve hits full open is that TDC and my timing chain installed correctly?

If nobody can say a definitive way to know without removing the cover I suppose I will do that but really don't want to....

This motor will be the death of me before long with how much I have done wrong on it I must have really been sleep deprived when building it because the stoker went off without a hitch and broke in fine...
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-22-2016, 02:39 AM   #366
lower50's
Registered User
 
lower50's's Avatar
 
Join Date: Oct 2014
Location: Kitchener, Ontario, Canada
Posts: 3,254
Re: Project Orange Crush (57 3100)

Honestly even tho it's a BB at 2000 rpm it is still basically idle (no load) I would think it will burn less than a gallon but I would have 5 gallons or so to make sure it does not suck air. I believe the dots should be pointing at each other. The intake valve should start to open at or a few deg before TDC and should be closed just before BDC. Good luck with the timing
__________________
http://67-72chevytrucks.com/vboard/s...d.php?t=648459
https://67-72chevytrucks.com/vboard/...d.php?t=769441
1951 MG TD
1967 Jeep CJ5 1.9L TDI 33X13.5X15 Mud Grapplers.
1952 GMC 9700 p/u 7.3L diesel on air, dually

Last edited by lower50's; 06-22-2016 at 02:45 AM.
lower50's is offline   Reply With Quote
Old 06-22-2016, 12:19 PM   #367
ptc
Registered User
 
ptc's Avatar
 
Join Date: Mar 2015
Location: Morada, CA --- (Near Lodi)
Posts: 1,443
Re: Project Orange Crush (57 3100)

Gallon of gas should be good....

Take the cover off and check it.... not worth ramming valves into pistons!

and use the Kendall Liquid Titanium oils, they have the MOST ZDDP zinc in them than any other oil and you can get it for like $3-5 a qt....



GT-1 High Performance with Liquid Titanium is formulated to provide excellent wear protection, to minimize the formation of sludge and varnish, and to resist viscosity and thermal breakdown, even in severe service. It also protects against rust and bearing corrosion, and is highly resistant to foaming. All viscosity grades are fortified with our exclusive Liquid Titanium additive technology for extra protection against engine wear. The Liquid Titanium additive enhancement provides increased engine protection by forming a strongly bonded titanium shield on the surface of critical engine parts, which reduces friction and wear and helps extend engine life. GT-1 High Performance with Liquid Titanium, SAE 20W-50, also contains a boosted level of zinc dialkyldithiophosphate (ZDDP) additive to provide additional wear protection and enhanced oxidation resistance for use in the most demanding applications. It is particularly recommended for use in turbocharged engines and in high-performance engines with flat-tappet camshafts, especially during the critical break-in period
__________________
My Build: 57 Chevy Pro-Street
ptc is offline   Reply With Quote
Old 06-22-2016, 12:23 PM   #368
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Quote:
Originally Posted by ptc View Post
Take the cover off and check it.... not worth ramming valves into pistons!
[/I]
I called a local engine builder he said if I put both marks pointed to the top it wouldn't matter and it would still fire and line up correctly the reason that people get them pointed at each other is to make damn sure they are lined up and not a tooth off he said with such a high lift cam when the engines actually running I could end up smashing valves into the piston even though it all cleared when spun by hand if it were on tooth off

Just looking to see if there's a definitive these are the things you look at and where they should be when the motor is at TDC or if we think I should just take the cover off and visually inspect....

I think I will just take the cover off
__________________
"Orange Crush"

Last edited by Valarius_Starchaser; 06-22-2016 at 02:19 PM.
Valarius_Starchaser is offline   Reply With Quote
Old 06-22-2016, 02:22 PM   #369
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Now thats the kind of stuff I was looking for ptc so does it not require any ZDDP additive or should I dump in a few ozs? Any numbers by 3rd parties to back up the actual ZDDP content?
look whats sitting on my desk now

Finding for the straight 50W it has slightly less ZDDP content than the 20w50 at 980ppm but then it has 100ppm of the titanium that is supposed to form a wear barrier and 890ppm of phosphorus not sure if that will work well I see guys say 1200ppm of ZDDP which would be zinc and phosphorus together so I'm good right?

Name:  IMG_2537.jpg
Views: 285
Size:  49.5 KB

Also having issues finding a timing tab locally due to having the 7 inch damper summit has them but not finding anything and don't care to pay for shipping on that looks like its time to order those rear rims up
__________________
"Orange Crush"

Last edited by Valarius_Starchaser; 06-22-2016 at 03:26 PM.
Valarius_Starchaser is offline   Reply With Quote
Old 06-23-2016, 12:53 AM   #370
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

Took off the front cover and was rewarded with this sight now I can sleep well at night...

Name:  IMG_2539.jpg
Views: 272
Size:  43.2 KB

Should have trusted my past self to have not botched it up but at the same time future me would have been upset if I had and past self was being incompetent that all make sense?



electrical progress consists of adding a HEI fuse to the fuse panel with the correct Delphi pins that I got from work working at a dealership has a few perks. I'm interested to understand exactly how thie ignition system on this truck works the back of my ignition switch says it has an ACC and START location but only has a single click as if it went into my ACC position am I needing a push button to start or am I missing something any info will I need a different switch or a push button? Also can this switch even be safely operated with a 12V system... I feel like the response to many if not all of these questions will be "youtube"

Also got some more done on the elcamino big block project cam bearings in and mains gauged and torqued no time to breathe in my day lately and I love it!
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-26-2016, 10:59 PM   #371
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

continued on with wiring hell today got all of the trans harness done "yippee" as well as most of the ignition system except the alternator not really even sure how to do it will need to find a diagram for it somewhere and the gauges not sure what exactly to do with the rear of the 57 gauge cluster's oil pressure gauge was hoping to use it but not so sure now

Also got the trans and motor all bolted up the started bolts that I go are to long "who ever heard of that?" I couldn't find any that were laying around that fit any suggestions? I've heard never not to use the knurled bolts on a starter but now I'm thinking I may need to

Got the accessories all bolted up as well as the trans output seal now all thats left on that is to get the cooler lines sorted out

We are getting close to break in time here fellas!

will have some pictures tomorrow fellas
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-27-2016, 11:42 AM   #372
Kim57
Registered User
 
Kim57's Avatar
 
Join Date: Aug 2007
Location: Corona, California
Posts: 7,998
Re: Project Orange Crush (57 3100)

Sounds like good progress.
Kim
__________________
My build thread
http://67-72chevytrucks.com/vboard/s...d.php?t=283107
Kim57 is offline   Reply With Quote
Old 06-27-2016, 11:48 AM   #373
II_Slow
Registered User
 
II_Slow's Avatar
 
Join Date: Jan 2012
Location: Celeste, Tx
Posts: 266
Re: Project Orange Crush (57 3100)

The accessory position may be CCW one click from the Off position.
Acc-Off-Ign-Start was the standard on older vehicles.
__________________
1955 SB Stepside 3100 big window cab on a 99 Ram 2500 Frame w/ 12-V Cummins diesel power and
47RH AOD transmission
http://67-72chevytrucks.com/vboard/s...d.php?t=640042
II_Slow is offline   Reply With Quote
Old 06-27-2016, 11:54 AM   #374
Valarius_Starchaser
Registered User
 
Valarius_Starchaser's Avatar
 
Join Date: Sep 2015
Location: Sioux Falls, South Dakota
Posts: 702
Re: Project Orange Crush (57 3100)

II slow it appears to only have two positions for the key to turn and stop in an off and ACC on the back it has Off-ACC-Ign1/Ign2-Start not sure if I have the Ign and Starts all correct or how it would engage them...

funny how thats the hard part for me and burning the chip and getting a dip switch sorted was the easy part seems backwards to me

My burned chip can be seen inside the housing
Name:  IMG_2553.JPG
Views: 223
Size:  76.5 KB
slot on the PCM for it
Name:  IMG_2554.JPG
Views: 224
Size:  107.0 KB
All secured down
Name:  IMG_2555.JPG
Views: 218
Size:  92.2 KB
Dip switch set to my tire size
Name:  IMG_2551.jpg
Views: 236
Size:  42.3 KB
And the DRAC Module that calculates Vehicle speed and if I had an electronic speedo would control that as well
Name:  IMG_2552.JPG
Views: 233
Size:  87.0 KB
__________________
"Orange Crush"
Valarius_Starchaser is offline   Reply With Quote
Old 06-27-2016, 12:14 PM   #375
II_Slow
Registered User
 
II_Slow's Avatar
 
Join Date: Jan 2012
Location: Celeste, Tx
Posts: 266
Re: Project Orange Crush (57 3100)

What key switch are you using?
Do you have a picture of the backside (lugs)?

More than likely, one of the two IGN positions will be hot in start position, and the other off in start position. The distributor/ignition needs power on during the starter engagement - all other stuff needs to be off for full current to the starter).
__________________
1955 SB Stepside 3100 big window cab on a 99 Ram 2500 Frame w/ 12-V Cummins diesel power and
47RH AOD transmission
http://67-72chevytrucks.com/vboard/s...d.php?t=640042
II_Slow is offline   Reply With Quote
Reply

Bookmarks

Tags
1957, 3100, 454, 4l80e, drag truck


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 03:56 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com