The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1973 - 1987 Chevrolet & GMC Squarebody Pickups Message Board > The 1973 - 1991 Blazers, Jimmys, and Suburbans Message Board

Web 67-72chevytrucks.com


Reply
 
Thread Tools Display Modes
Old 01-15-2013, 10:46 AM   #601
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Quote:
Originally Posted by Bhelton View Post
Done yet?? Looks like some progress will be coming!
Posted via Mobile Device
Quote:
Originally Posted by Rusbuilt View Post
She's stripped down now!! Good work!
yes she is ! ready to go !
Quote:
Originally Posted by classicchev View Post
http://67-72chevytrucks.com/vboard/s...01#post5818401

They are still in California, but I should have them by the end of the month

Sorry Mike for movin in to your thread, but I think you get my point of posting
No problem man, you can always share info on my page !
67cheby is offline   Reply With Quote
Old 01-15-2013, 01:59 PM   #602
oldman3
Senior Member
 
oldman3's Avatar
 
Join Date: Mar 2011
Location: West Plains, Missouri
Posts: 7,559
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Hey Mike, I noticed that you and Chip were working together on the Blazer, so I did a quick check on google earth and even though two different states, you guys are only a about 10 miles apart (straight as the crow flies). This is great that your that close and can help each other on project....Jim
oldman3 is offline   Reply With Quote
Old 01-15-2013, 02:05 PM   #603
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Yes , Chip (Tireblazin) has been a HUGE help and part of this build, if he wouldnt have voluntered to help me and let me use his shop i probably wouldnt have even really considered trying to do this build, since i have no shop ! Luckily for me he is a great friend and my only close friend in this area that also has a car ADDICTION ! Thanks CHIP !
67cheby is offline   Reply With Quote
Old 01-15-2013, 05:28 PM   #604
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Ok i need some of you Motor guys to educate me...what is the difference in 5.3 and Ls1, Ls2 , Ls3...... ????? I am getting really confused looking at all these different motors ? Go all aluminum or not all aluminum ?
67cheby is offline   Reply With Quote
Old 01-15-2013, 05:39 PM   #605
lolife99
67-72 parts collector,…
 
lolife99's Avatar
 
Join Date: Nov 2002
Location: Mid-MO
Posts: 22,700
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Quote:
Originally Posted by 67cheby View Post
Ok i need some of you Motor guys to educate me...what is the difference in 5.3 and Ls1, Ls2 , Ls3...... ????? I am getting really confused looking at all these different motors ? Go all aluminum or not all aluminum ?
http://www.gmhightechperformance.com...y/viewall.html

http://www.retrolsx.com/forums/showthread.php?t=38
__________________
Keith

Convert to disc brakes.
http://67-72chevytrucks.com/vboard/s...d.php?t=444823

Last edited by lolife99; 01-15-2013 at 05:44 PM.
lolife99 is offline   Reply With Quote
Old 01-15-2013, 05:51 PM   #606
Cherub
Registered User
 
Cherub's Avatar
 
Join Date: Feb 2008
Location: Houston
Posts: 970
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

that first link lolife posted pretty much sums it up. it all comes down to what you plan on doing with the motor.
Cherub is offline   Reply With Quote
Old 01-15-2013, 06:41 PM   #607
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Sweet, i will do some reading THANK YOU ! oh and here are a few pictures i just recieved
Attached Images
     
67cheby is offline   Reply With Quote
Old 01-15-2013, 06:42 PM   #608
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

and a couple more , actual mockup of my front end, shipping out today !
Attached Images
  
67cheby is offline   Reply With Quote
Old 01-15-2013, 06:58 PM   #609
LEEVON
Moderator
 
LEEVON's Avatar
 
Join Date: Jul 2006
Location: Ozark, MO
Posts: 4,888
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Wow, that's beefy! Love the splined sway bar.

Keep it simple and cheap on the engine. Go with an iron block 5.3L unless you find a smoking deal on something else. I don't think you're going for a tire fryer, just a cruiser? Stock 5.3L's have more than enough guts to get you around quickly and efficiently, and if you ever get bored just cam it. The tune you will get alone will be a huge improvement over stock. Aluminum engines and 6.0's have more potential but also cost more, save your bucks and spend it on "cool" : )
__________________
'20 Silverado Trail Boss ~ '17 Tahoe ~ '79 K15 Sierra Grande ~ '76 Blazer 2wd ~ '71 Cheyenne swb ~ '55 Pontiac Safari ~'50 3100 bagged ~ '80 Wife ~ Late model kids
LEEVON is offline   Reply With Quote
Old 01-15-2013, 07:12 PM   #610
babyblueoval
Registered User
 
babyblueoval's Avatar
 
Join Date: Apr 2006
Location: Arkansas
Posts: 835
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Dang!! those sway bar arms are MASSIVE!!
__________________
Jim

'71 Blazer-Porterbuilt Dropmember C4/LS1/6L80E
'57 VW beetle - Oct. 2006 Hot VW's pg. 87 - 350hp intercooled, turbocharged, EFI 2.3liter and 5spd in the works
'87 BMW 325i - daily driver
babyblueoval is offline   Reply With Quote
Old 01-15-2013, 09:16 PM   #611
bagged74
its just $$$$$
 
bagged74's Avatar
 
Join Date: Jul 2003
Location: OK
Posts: 2,078
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Looking good.
Posted via Mobile Device
bagged74 is offline   Reply With Quote
Old 01-15-2013, 10:28 PM   #612
aggie91
I'm just glad to be here!
 
aggie91's Avatar
 
Join Date: Jan 2008
Location: Longview, TX
Posts: 4,788
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

I agree with LEEVON, get a LM7 (iron block 5.3 out of GM truck). With a small cam and a good tune, you have 400hp and can get 18-20mpg.
Posted via Mobile Device
__________________
Karl



1965 Chevy Stepside(Grandpa's Old Blue) and (July 2015 Shop Build!)(2020, the Saga Continues)
http://67-72chevytrucks.com/vboard/s...d.php?t=372424

The LST Challenge:
http://67-72chevytrucks.com/vboard/s...=1#post7812257

Korbin's 1st Square: "Sunburn"
http://67-72chevytrucks.com/vboard/s...d.php?t=418618

1985 GMC Sierra: "White Trash", Korbin's 2nd now...
http://67-72chevytrucks.com/vboard/s...d.php?t=632305

Henry - 1984 Chevrolet, Owen's 1st Square
aggie91 is offline   Reply With Quote
Old 01-15-2013, 10:30 PM   #613
jtp67-72
Registered User
 
jtp67-72's Avatar
 
Join Date: Apr 2007
Location: dequincy la.
Posts: 1,465
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

may intrique u........

http://www.ebay.com/itm/03-04-05-06-...4ea65d&vxp=mtr
__________________
Build thread at http://67-72chevytrucks.com/vboard/s...d.php?t=475791
jtp67-72 is offline   Reply With Quote
Old 01-15-2013, 10:47 PM   #614
babyblueoval
Registered User
 
babyblueoval's Avatar
 
Join Date: Apr 2006
Location: Arkansas
Posts: 835
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Coming from Daytona Beach, FL might break the deal on that one.
Great price though.
__________________
Jim

'71 Blazer-Porterbuilt Dropmember C4/LS1/6L80E
'57 VW beetle - Oct. 2006 Hot VW's pg. 87 - 350hp intercooled, turbocharged, EFI 2.3liter and 5spd in the works
'87 BMW 325i - daily driver
babyblueoval is offline   Reply With Quote
Old 01-15-2013, 11:37 PM   #615
raull
Registered User
 
raull's Avatar
 
Join Date: Mar 2009
Location: miramar florida
Posts: 1,232
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

hummmm !!!! where have i seen that front end set up before !!! lol its gona be killer you'll love it ,,, as for the engine i agree with the guys , the twin turbo powerplant i'm building its an lm7 5.3 , hundreds of them out there
__________________
check out my build thread

71 c/10 step side 5.3 twin turbo

http://67-72chevytrucks.com/vboard/s...d.php?t=485320

raul
raull is offline   Reply With Quote
Old 01-15-2013, 11:42 PM   #616
DrppdBlazr
Registered User
 
DrppdBlazr's Avatar
 
Join Date: Dec 2012
Location: Mesa, AZ
Posts: 276
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

wow..........................awesome
DrppdBlazr is offline   Reply With Quote
Old 01-16-2013, 12:05 AM   #617
jtp67-72
Registered User
 
jtp67-72's Avatar
 
Join Date: Apr 2007
Location: dequincy la.
Posts: 1,465
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Quote:
Originally Posted by babyblueoval View Post
Coming from Daytona Beach, FL might break the deal on that one.
Great price though.
He know's I'm always lookin!! I've got an 8800 mile LS3 on the stand........whoops .....better go now...........lol..............jim
__________________
Build thread at http://67-72chevytrucks.com/vboard/s...d.php?t=475791
jtp67-72 is offline   Reply With Quote
Old 01-16-2013, 10:02 AM   #618
N2TRUX
Happy to be here
 
N2TRUX's Avatar
 
Join Date: Mar 2000
Location: Cypress, TX
Posts: 39,021
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

If your buying a complete motor the 5.3 is a good deal. If your building a block, start with a 6.0 or 6.2. You can build a 500hp motor with ease that will run on pump gas with the a/c blasting all day long.
__________________
Follow me on Facebook and Instagram @N2trux.com

Articles-

"Jake" the 84 to 74 crewcab

"Elwood" the77_Remix

85 GMC Sierra "Scarlett"

"Refining Sierra"
N2TRUX is offline   Reply With Quote
Old 01-16-2013, 10:47 AM   #619
dropd80s
Registered User
 
dropd80s's Avatar
 
Join Date: Mar 2003
Location: wichita falls tx
Posts: 429
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Quote:
Originally Posted by 67cheby View Post
Thanks man, Charles said the same thing !
Great minds think alike!

Quote:
Originally Posted by LEEVON View Post
Wow, that's beefy! Love the splined sway bar.

Keep it simple and cheap on the engine. Go with an iron block 5.3L unless you find a smoking deal on something else. I don't think you're going for a tire fryer, just a cruiser? Stock 5.3L's have more than enough guts to get you around quickly and efficiently, and if you ever get bored just cam it. The tune you will get alone will be a huge improvement over stock. Aluminum engines and 6.0's have more potential but also cost more, save your bucks and spend it on "cool" : )
I agree. The aluminum blocks dont save as much weight as you'd think either, not that you're worried about weight in K5, lol. Unless youre looking for BIG power, 5.3s are great. I mean, thats what i went with!
__________________
"I'm Dirk Diggler enough to own and operate a vehicle of this caliber" -veinbar

Dropped and LS Swapped SWB 87 Build Thread
dropd80s is offline   Reply With Quote
Old 01-16-2013, 12:27 PM   #620
jkeating1
Registered User
 
jkeating1's Avatar
 
Join Date: Dec 2012
Location: Allen, TX
Posts: 519
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Hmmm....I get it....Sarah Losh, S.Losh, Slosh, Slosh Tubz! So that was HER idea!
__________________
JK
jkeating1 is offline   Reply With Quote
Old 01-16-2013, 12:56 PM   #621
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Quote:
Originally Posted by LEEVON View Post
Wow, that's beefy! Love the splined sway bar.
thanks man, me too !
Keep it simple and cheap on the engine. Go with an iron block 5.3L unless you find a smoking deal on something else. I don't think you're going for a tire fryer, just a cruiser? Stock 5.3L's have more than enough guts to get you around quickly and efficiently, and if you ever get bored just cam it. The tune you will get alone will be a huge improvement over stock. Aluminum engines and 6.0's have more potential but also cost more, save your bucks and spend it on "cool" : )
Cool, thanks
Quote:
Originally Posted by babyblueoval View Post
Dang!! those sway bar arms are MASSIVE!!
going to do some corner carving ! LOL
Quote:
Originally Posted by bagged74 View Post
Looking good.
Posted via Mobile Device
thanks man !
Quote:
Originally Posted by aggie91 View Post
I agree with LEEVON, get a LM7 (iron block 5.3 out of GM truck). With a small cam and a good tune, you have 400hp and can get 18-20mpg.
Posted via Mobile Device
oh yea !!
Quote:
Originally Posted by jtp67-72 View Post
hmmmmm....
Quote:
Originally Posted by babyblueoval View Post
Coming from Daytona Beach, FL might break the deal on that one.
Great price though.
fun road trip ! LOL
Quote:
Originally Posted by raull View Post
hummmm !!!! where have i seen that front end set up before !!! lol its gona be killer you'll love it ,,, as for the engine i agree with the guys , the twin turbo powerplant i'm building its an lm7 5.3 , hundreds of them out there
LOL, thanks !
Quote:
Originally Posted by DrppdBlazr View Post
wow..........................awesome
thanks man
Quote:
Originally Posted by jtp67-72 View Post
He know's I'm always lookin!! I've got an 8800 mile LS3 on the stand........whoops .....better go now...........lol..............jim
help a brother out ! LOL
Quote:
Originally Posted by N2TRUX View Post
If your buying a complete motor the 5.3 is a good deal. If your building a block, start with a 6.0 or 6.2. You can build a 500hp motor with ease that will run on pump gas with the a/c blasting all day long.
cool !
Quote:
Originally Posted by dropd80s View Post
Great minds think alike!

yes, lol

I agree. The aluminum blocks dont save as much weight as you'd think either, not that you're worried about weight in K5, lol. Unless youre looking for BIG power, 5.3s are great. I mean, thats what i went with!
yea, not to worried about weight , just wanting something fun and not underrpowered !
Quote:
Originally Posted by jkeating1 View Post
Hmmm....I get it....Sarah Losh, S.Losh, Slosh, Slosh Tubz! So that was HER idea!
LOL, my knickname in high school was SLOSH ...just worked out that i married a Sarah so it works on both levels !
67cheby is offline   Reply With Quote
Old 01-17-2013, 10:31 AM   #622
67cheby
67cheby
 
67cheby's Avatar
 
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

well after me a Chip stood around scratching our heads for an hour or so.... i am now thinking about building a frame table... LOL
Attached Images
     
67cheby is offline   Reply With Quote
Old 01-17-2013, 11:33 AM   #623
watahyahknow
Registered User
 
watahyahknow's Avatar
 
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

i think the frame can be made quite a bit straighter you only need to get the bodymounts farther out

seen jessy james on one of his builds weld the frame on small box profile legs too the ramps of a four post lift to level it and keep it in place while he was cutting bending and welding on it (he was narrowing the front frame of an A ford) i was thinking of doing sumtin like that but only to fixate the frame with 2 3 foot beams about 4 inch square and some metal scrap to make some traingles and a few legs tackwelded to keep the frame floating in mid air after i cut it to put in the kick up for the diff as long as the tacks dont break i weld a little at the time at different places so it doesnt pull and the frame itself is straight to start with that should be enough
__________________
i got a job again and having fun at it too

idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real

i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts

Last edited by watahyahknow; 01-17-2013 at 11:46 AM.
watahyahknow is offline   Reply With Quote
Old 01-17-2013, 09:25 PM   #624
jtp67-72
Registered User
 
jtp67-72's Avatar
 
Join Date: Apr 2007
Location: dequincy la.
Posts: 1,465
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Take a look..........

http://www.ebay.com/itm/03-TAHOE-ENG...39be1b&vxp=mtr

http://www.ebay.com/itm/2008-CHEVROL...494e2c&vxp=mtr

freight probably less than 250.............jim
__________________
Build thread at http://67-72chevytrucks.com/vboard/s...d.php?t=475791
jtp67-72 is offline   Reply With Quote
Old 01-17-2013, 09:33 PM   #625
Scottshotrods
Registered User
 
Join Date: Oct 2008
Location: oxnard ca
Posts: 2,201
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy

Not bad deals on those motors at all

Justin
Scottshotrods is offline   Reply With Quote
Reply

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 05:59 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com