04-28-2011, 12:04 AM | #701 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Still working on it.
I finalized the rear brake line routing & I'm ready to cut the front to rear lines to the exact length (the front section of line will get trimmed to length). This took a little longer than desired because I needed to get the e-brake hardware in place to ensure there was no interference between everything. Before the e-brake stuff could go in, I had to find it all & then clean it up.... I have to get more hardware for the cushion clamps tomorrow (I keep moving the same set of bolts from here to there for trial fit). Then I'll secure the line front to rear so I can be 100% certain I have the correct length before cutting & flaring the line. When that's done, all the hard lines come out again for 'detailing' (fuel & brake lines) then it's on to the exhaust!
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. |
05-04-2011, 12:09 AM | #702 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Brake line plumbing is complete. I yanked everything back out to clean all the lines to prep for some detailing before final install....
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. |
05-04-2011, 09:21 AM | #703 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Project: Recycle
nice looking bends
|
05-04-2011, 11:00 AM | #704 |
Happy to be here
Join Date: Mar 2000
Location: Cypress, TX
Posts: 39,023
|
Re: Project: Recycle
Clean look Scot. Keep it going buddy.
__________________
Follow me on Facebook and Instagram @N2trux.com Articles- "Jake" the 84 to 74 crewcab "Elwood" the77_Remix 85 GMC Sierra "Scarlett" "Refining Sierra" |
05-04-2011, 05:28 PM | #705 |
I'm just glad to be here!
Join Date: Jan 2008
Location: Longview, TX
Posts: 4,788
|
Re: Project: Recycle
Looks good Scoti.
What are you going to do to them for the "detailing" you mentioned?
__________________
Karl 1965 Chevy Stepside(Grandpa's Old Blue) and (July 2015 Shop Build!)(2020, the Saga Continues) http://67-72chevytrucks.com/vboard/s...d.php?t=372424 The LST Challenge: http://67-72chevytrucks.com/vboard/s...=1#post7812257 Korbin's 1st Square: "Sunburn" http://67-72chevytrucks.com/vboard/s...d.php?t=418618 1985 GMC Sierra: "White Trash", Korbin's 2nd now... http://67-72chevytrucks.com/vboard/s...d.php?t=632305 Henry - 1984 Chevrolet, Owen's 1st Square |
05-04-2011, 05:58 PM | #706 | |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Quote:
I did reach out & inquire about possibly plating them but haven't yet received solid answers on brake fluid vs. plating.
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. |
|
05-04-2011, 07:19 PM | #707 |
Registered User
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
|
Re: Project: Recycle
i think there ways of doing the plating youreself http://www.caswellplating.com/kits/
all you need is a big enough container to dip the lines in (might make a custom one verry simply from pondliner covering a trench dug in some sand somewhere ) be warned that it produces some hazardous waste materials and vapours
__________________
i got a job again and having fun at it too idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts |
05-04-2011, 10:52 PM | #708 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Well, the 'paint' detail looks decent enough but I don't know.... My buddy called me back & said we could plate the lines if a few obstacles can be over-come.
So tonight is research & tomorrow I'll get some feedback from another gearhead who understands how my AOCD works (he'll get a chance to see the line in person vs. trying to assess a picture). (automotive OCD for those wondering )
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. |
05-23-2011, 10:46 PM | #709 |
Village Idiot....
Join Date: Jul 2003
Location: Rowlett, Texas
Posts: 1,833
|
Re: Project: Recycle
I know your not letting the grass grow under your feet so.......what's the status of the truck?
__________________
http://www.hubgarage.com/mygarage/n2billet -67 SWB Custom Porterbuilt Front and rear 20/22's Hazel Sold -71 StepSide Porterbuilt Stage 2 with 20/22's Stella Mae Sold |
05-24-2011, 12:02 AM | #710 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
The brake lines have not progressed beyond what was last posted (& what you last saw in your driveway). I did drop the manifolds off early last week to get them coated & picked them up Friday afternoon. Unfortunately, I didn't leave work until 10pm Friday night.
We had a big project @ work that we've been gearing up for that started Friday. It required alot of validation & testing so between work & family obligations, I haven't even been in the same building as the chassis since the night I stopped by your house. Any spare time I've had has been spent working on the dually. I'm trying to determine the source for my 'water loss' issue. If I get it out on the highway, I start losing water from somewhere & the truck starts heating up. Tonight I finished up removing the water pump & radiator (for replacment tomorrow after work).
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. Last edited by SCOTI; 05-24-2011 at 12:08 AM. |
06-13-2011, 10:08 PM | #711 |
Village Idiot....
Join Date: Jul 2003
Location: Rowlett, Texas
Posts: 1,833
|
Re: Project: Recycle
Any progress Scoti?
__________________
http://www.hubgarage.com/mygarage/n2billet -67 SWB Custom Porterbuilt Front and rear 20/22's Hazel Sold -71 StepSide Porterbuilt Stage 2 with 20/22's Stella Mae Sold |
06-13-2011, 10:52 PM | #712 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Depends on your definition....
I installed the brake lines & part of the fuel lines (rear line from the tank). I still need to get some rubber fuel hose to protect the outside of the middle/front fuel lines to isolate them where they route thru the frame boxing & reinforcements. I got the 3/8" stainless exhaust pipe flanges finished. I mounted the pass side manifold & have been chopping up pieces of tubing to determine the 'right' length of exhaust drop so I can remove/service the starter & not cook the brake fluid to the rear brakes. I played w/a couple of different pieces after work today to get things close so tomorrow I'll start trimming them to tack in place. Once tacked in place, I'll verify the starter can be easily removed & continue on from there.
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. Last edited by SCOTI; 06-13-2011 at 10:53 PM. |
06-14-2011, 07:35 PM | #713 |
Tot Roddin'
Join Date: Apr 2005
Location: Mid-MO
Posts: 24,461
|
Re: Project: Recycle
Hope life is treating you well SCOTI... been a while since I've been able to keep track of your build. Are we going to see you up this way again in September?
BTW...what did you coat the ram horns in? Powdercoat?
__________________
-Nate 1969 CST SWB - Project Blank Slate (4.5/6" ECE Static Drop, 6-lug disc brake upgrade (manual), Billet Specialties Vintec 20x8.5 255/40 (F) 20x10 295/40 (R), 250 I-6) 1960 AMF Skylark - Tot Roddin' (Lowered with custom frame; soon to include custom push bar and interior) 2008 Silverado CrewCab 1LT (5.3L, 3:73, 4x4, LT1, Z-71, Towing Package) |
06-14-2011, 10:39 PM | #714 | |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Quote:
We do plan to be there again this year. It should be the same group w/a few others from what N2billet mentioned in previous conversations. I do hope to be bringing the 64 (driving it actually ). The exhaust manifolds have a high temp coating that's basically like powder coating. They did the standard 'ceramic' finish (like what you get on ceramic coated headers) & then they did a top-coat of 'tungsten' which is a higher temp coating that looks very close to 'as-cast' parts in color & it has an egg-shell/satin feeling to the touch. Today I cut up a 45° elbow & indexed several pieces of tubing to form the transition from the manifold flange to the straight section of pipe that runs parallel to the frame rail (alongside the trans). I'll tack it together tomorrow @ work & verify things are 'close'. I'm trying to get each side indexed & tacked together so we can get it welded by early next week.
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. |
|
06-14-2011, 10:42 PM | #715 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
And for the wise-guys.... those aren't my digits. They belong to my freshly graduated young-gun....
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. Last edited by SCOTI; 06-14-2011 at 10:50 PM. |
06-14-2011, 10:58 PM | #716 |
Account Suspended
Join Date: Sep 2009
Location: High Plains of Colorado
Posts: 2,485
|
Re: Project: Recycle
Nice try Scoti, but your busted.
Only way to have any credibility now is to use Chevy Orange nail polish when you hold the parts next time. |
06-15-2011, 07:12 PM | #717 |
Registered User
Join Date: Jun 2007
Location: DFW (Forney)
Posts: 1,529
|
Re: Project: Recycle
Sure , sure , I'm sure those aren't your fingers in the pics.
Nice progress. Done anything else to the dually?
__________________
'58 SWB Fleetside...Front & Rear Porterbuilt Dropmember, 6.0 LS /4L60E. Accuair E-level, 20 Billet Specialties (Vintecs) '63 Buick Riviera ... AccuAir E-level, 20" Billet Specialties (Vintecs) http://67-72chevytrucks.com/vboard/s...=528853&page=5 |
06-15-2011, 07:39 PM | #718 |
Village Idiot....
Join Date: Jul 2003
Location: Rowlett, Texas
Posts: 1,833
|
Re: Project: Recycle
I thought we both agreed we were going to wear black!
Posted via Mobile Device
__________________
http://www.hubgarage.com/mygarage/n2billet -67 SWB Custom Porterbuilt Front and rear 20/22's Hazel Sold -71 StepSide Porterbuilt Stage 2 with 20/22's Stella Mae Sold Last edited by n2billet; 06-15-2011 at 09:02 PM. |
06-15-2011, 09:14 PM | #719 |
Registered User
Join Date: Feb 2011
Location: Roy, WA.
Posts: 77
|
Re: Project: Recycle
|
06-15-2011, 11:02 PM | #720 | |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Quote:
I worked on the cooling issue I've had since late March but found out today, it's still around. My normal 15-20min drive to work yielded 210° as I was pulling into the parking lot. When I re-check the coolant level, I was 2.5gals low again. But, driving home tonight from the shop may have provided some info. As I was cruising along (5mins into the drive home), the truck just died. I coasted to a parking lot for a quick inspection. Each attempt @ a re-start seemed like I had a heat-soak issue. I removed the EXTREMELY hot air cleaner lid & it looks like the inside of a boiling pot. Once I got it re-started, I can see a mist shooting up from the TB base. I guess the TB coolant loop is cracked @ the base plate. I'm going to try & bypass the loop & see if there's a change. I took off from work next week to finish up the 64's exhaust & rebuild the duallys brakes/suspension. My plan was to drop it while completing the other tasks (mild 4/6 drop). As far as the 64, I got several pieces for the pass side tacked together today & things look good. I finished setting up that side so there's a couple more pieces that need to be tacked in place & then I'll verify the starter can be dropped w/that exhaust pipe in place. Since I came to a stopping point there, I started the drivers side. I got the preliminary discharge piping cut & mocked up. I'll get them tacked together as well tomorrow & re-installed to verify everything fits/flows well. If I can get things tacked early enough, it's possible I'll have both sides (from the manifold flanges to the truck-arm x-member) welded by tomorrow night.
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. Last edited by SCOTI; 06-15-2011 at 11:09 PM. |
|
06-16-2011, 11:12 AM | #721 |
Under Construction
Join Date: Oct 2007
Location: Midlothian,TX (DFW)
Posts: 4,555
|
Re: Project: Recycle
nice progress Scoti!
__________________
Heath subscribe to the board here: http://67-72chevytrucks.com/vboard/payments.php http://67-72chevytrucks.com/vboard/s...d.php?t=157669 FAQ how to's 1956 Chevy Apache 1967 C10 SWB FleetSide (under construction) 1969 K10 SWB FleetSide (Future Build) 1972 C10 SWB Stepside (Future Build) 56 chevy truck : http://www.cardomain.com/ride/2955823/1 67 truck build: http://www.67-72chevytrucks.com/vboard/showthread.php?t=281357/1 69 k10: http://67-72chevytrucks.com/vboard/s...d.php?t=389470 |
06-16-2011, 12:45 PM | #722 |
Registered User
Join Date: Aug 2005
Location: Hillsboro Oregon
Posts: 6,449
|
Re: Project: Recycle
Looking good man!
|
06-16-2011, 02:42 PM | #723 |
chevy only
Join Date: Sep 2006
Location: Phoenix, AZ
Posts: 6,619
|
Re: Project: Recycle
Nice work kat!!
__________________
CHEVY ONLY... Nothin Else ! |
06-16-2011, 03:23 PM | #724 |
Registered User
Join Date: Apr 2001
Location: DALLAS,TX
Posts: 22,041
|
Re: Project: Recycle
Pass side from manifold to TA x-member all tacked together & installed. I'll drop the starter tonight & make sure it's good to weld.
The drivers side got tacked together as well. I made a small 'spool' piece to get the best alignment so I still need to do some finish grinding for the best clearance. I should be able to get the drivers side all tacked together (to the TA x-member) by tomorrow. Then I'll start on the cross-over pipe. On a bad note.... I unfortunately confirmed the diagnosis on the dually's BBC when I checked the oil again this morning. It definitely has a blown head gasket.
__________________
67SWB-B.B.RetroRod 64SWB-Recycle 89CCDually-Driver/Tow Truck 99CCSWB Driver All Fleetsides @rattlecankustoms in IG Building a small, high rpm engine with the perfect bore, stroke and rod ratio is very impressive. It's like a highly skilled Morrocan sword fighter with a Damascus Steel Scimitar..... Cubic inches is like Indiana Jones with a cheap pistol. Last edited by SCOTI; 06-16-2011 at 03:24 PM. |
06-16-2011, 03:40 PM | #725 |
67-72 parts collector,…
Join Date: Nov 2002
Location: Mid-MO
Posts: 22,700
|
Re: Project: Recycle
What's the plan?
Fix it or start an LS swap.
__________________
Keith Convert to disc brakes. http://67-72chevytrucks.com/vboard/s...d.php?t=444823 |
Bookmarks |
|
|