05-15-2013, 12:09 PM | #1326 |
JRods Garage
Join Date: Dec 2009
Location: East Highland, CA
Posts: 1,098
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Im incredibly jealous right now!!! LOL
__________________
Orange Julius-My dropmember'd, LS'd, SWB street machine... |
05-15-2013, 12:11 PM | #1327 |
Registered User
Join Date: Mar 2013
Location: Grand Island, Ne.
Posts: 1,110
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Me too Me too!!!!
__________________
J. Vess, 6'6", Gearhead, Welder, Fabricator, Nutcase 1955 Chevy Stepside "Dudley" My daily http://www.67-72chevytrucks.com/vboa...d.php?t=760288 1972 Chevy C10, Project "Chevro~Layed out" Nether Storm Build Thread http://67-72chevytrucks.com/vboard/s...23#post6007523 |
05-15-2013, 12:37 PM | #1328 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Thanks guys, dang page flip ! Here is a picture for this page !
|
05-15-2013, 12:39 PM | #1329 |
Registered User
Join Date: Aug 2012
Location: Houston, Texas
Posts: 2,475
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
It's purtty!!!
So I have a question since I only really know the basic knowledge for the ls blocks, can you explain for me what its for if you don't mind Mike? I understand its an efi for ls, but what's the details of it.
__________________
Korwin 77 C10 Silverado Sharkbite LWB Build 67 Chevy C10 Frame Off 06 Dodge Magnum 2.7v6 aka swag wag! 2010 Honda Accord 2.4I4 DD aka Liquid Metal |
05-15-2013, 12:55 PM | #1330 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
a simple to hook up , clean system with about 25% of the wiring that would be on a factory harness re-work and built in controller for all the adjustments
|
05-15-2013, 01:04 PM | #1331 |
Registered User
Join Date: Nov 2012
Location: Salt Lake City, UT
Posts: 520
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Very very cool. I've been waiting for that as well. They're not bad for the price either.
|
05-15-2013, 01:22 PM | #1332 |
Registered User
Join Date: Feb 2012
Location: turlock
Posts: 2,177
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Wow is there anything you can't get set up Mike? Awesome package from MSD
Posted via Mobile Device
__________________
Project NewType 1972 Chevy C/10 Cheyenne Super ( Daily Driven Showtruck ) http://67-72chevytrucks.com/vboard/s...d.php?t=507903 Project Great Grandpa's Legacy 1973 Chevy C/10 Cheyenne ( Current daily driver collecting big time parts ) http://67-72chevytrucks.com/vboard/s...89#post7084289 - Dylan (209)-985-7721 |
05-15-2013, 01:30 PM | #1333 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
LOL....yes there are several things still not covered !
|
05-15-2013, 01:41 PM | #1334 |
Registered User
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
like the electric controll for the transmission if you have to buy an aftermarket controller for that too it can still become pricey unles you have a mecanical trans
__________________
i got a job again and having fun at it too idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts |
05-15-2013, 03:05 PM | #1335 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
it does control the transmission and dual electric fans
|
05-15-2013, 03:43 PM | #1336 |
JRods Garage
Join Date: Dec 2009
Location: East Highland, CA
Posts: 1,098
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
__________________
Orange Julius-My dropmember'd, LS'd, SWB street machine... |
05-15-2013, 03:57 PM | #1337 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
I stand corrected......it does not control the transmission !
|
05-15-2013, 04:08 PM | #1338 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
maybe this would be an option ? http://www.painlesswiring.com/webcat...rchField=66501
|
05-15-2013, 04:14 PM | #1339 |
Registered User
Join Date: Mar 2013
Location: Grand Island, Ne.
Posts: 1,110
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Thats a really nice setup,... but way outta my price range.
__________________
J. Vess, 6'6", Gearhead, Welder, Fabricator, Nutcase 1955 Chevy Stepside "Dudley" My daily http://www.67-72chevytrucks.com/vboa...d.php?t=760288 1972 Chevy C10, Project "Chevro~Layed out" Nether Storm Build Thread http://67-72chevytrucks.com/vboard/s...23#post6007523 |
05-15-2013, 06:06 PM | #1340 |
Registered User
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
you might need to read up a little on the new injection setup before buying a transcontroller , from wat i can remember you need some leads of the injection setup hooked up to the trans computer to have it work propperly
think it was gaspedal positioning sensor enginevacuum? and rpm might allso need some engine temperature reading im suprized msd doesnt make a add on for that , then again they might allready be working on that
__________________
i got a job again and having fun at it too idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts |
05-15-2013, 06:55 PM | #1341 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
they are working on it but said it would be 2014 before it was ready !
|
05-15-2013, 09:21 PM | #1342 |
Registered User
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
that might still be on time then ....... eh sema was next year wasnt it ?
__________________
i got a job again and having fun at it too idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts |
05-15-2013, 09:59 PM | #1343 |
Registered User
Join Date: Dec 2012
Location: Allen, TX
Posts: 519
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
I hope I don't interrupt the well-justified Christmas euphoria (I'm envious)---but I thought of you when I saw the thread below. Since you have become a framery practitioner, and a Cadillac owner; you gotta dig this 57 Eldog frame from the Roadster Shop
http://www.lateral-g.net/forums/show...light=cadillac
__________________
JK |
05-15-2013, 10:38 PM | #1344 |
Registered User
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
wow heavy metal pornografi it was about wat i thought about the ls engine with turbos and the custom chassis , i have to agree with some of the other people on that forum , thats some big bucks being poored into that car
__________________
i got a job again and having fun at it too idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts |
05-16-2013, 06:54 PM | #1345 | |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Quote:
|
|
05-16-2013, 08:13 PM | #1346 |
Registered User
Join Date: Jun 2011
Location: Spokane, WA
Posts: 2,372
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
No joke! I bookmarked that and will be checkin in. That dude has a sweet shop and some mad skills. Prolly a buck or two too! Did you see that sick carpet/fur crap he's layin down and the dude sayin he wanted to roll around naked on it!? OMG! How bout them wheels - sheesh!! Mike, thread your Cad on 67-72! Losh's Luscious Caddy - Restomod and the ultimate money pit!
Sweet score on the MSD stuff Mike! We'll be interested in how you deal with the trans deal. Nothing wrong with a good old TH400 neitha!
__________________
'77 K30 3+3 - "The Crummy" http://67-72chevytrucks.com/vboard/s...d.php?t=640134 '67 C10 L/SWB - Soon to be daily driver! http://67-72chevytrucks.com/vboard/s...d.php?t=471776 |
05-16-2013, 08:47 PM | #1347 |
Registered User
Join Date: Dec 2012
Location: Allen, TX
Posts: 519
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
I've read several reviews and opinions of stand-alone E transmission controllers from members on this forum. One good thing, ya got more room in a Jimmy for controller boxes than in a C truck!
Posted via Mobile Device
__________________
JK |
05-16-2013, 10:01 PM | #1348 |
67cheby
Join Date: Sep 2008
Location: siloam springs ar 72761
Posts: 17,890
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
We're there any reviews on the Painless one ?
Posted via Mobile Device |
05-16-2013, 10:28 PM | #1349 |
Registered User
Join Date: Jul 2006
Location: the netherlands europe
Posts: 4,335
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
the compushift one is about the best in the time i was investigating options to run a 4L80E
they allso have an option for flapper pedals on the steering for up and downshifting like they have on porsches and other high end cars was just checking real quick and their price is still close to that of a small second hand car http://www.twistmachine.com/index.ph...FYXMtAodqwsAoA i have to say there been a few years past since and i bet there a lot more controllers available now
__________________
i got a job again and having fun at it too idea's for the trucks and the order of things to do are taking shape and get closer to being realized , a few more months and i be able to start building for real i complete 2 of the trucks intoo running fashion one custom and one basicly stock the thirth will be sacrificed for parts |
05-16-2013, 10:38 PM | #1350 |
Registered User
Join Date: Dec 2012
Location: Allen, TX
Posts: 519
|
Re: Slosh Tubz new company project "Square Peg" frame laying 1987 GMC Jimmy
Not that stand out in my mind. I just remember a good referral on the TCI. The other ones are names I'm not familiar with. Plus, these things are kind of a moving target, as they evolve as time passes.
__________________
JK |
Bookmarks |
|
|