The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 02-06-2006, 11:44 PM   #1
hardliquor1
Registered User
 
Join Date: Jan 2006
Location: Rapid City, Mi.
Posts: 21
1 or 2 peice drive shaft?

I am chopping the frame on my 68 lwb 454/400 trans. and making a swb. I am also lowering it 4/6". My question is do I have to modify my center cross brace to run a 1 peice drive shaft? Or am I going to have to stick with the carrier bearing and modify my current drive shaft. does anyone know where to have a drive shaft built, or are they available for what I am doing?
hardliquor1 is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 11:29 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com