![]() |
Register or Log In To remove these advertisements. |
|
|
![]() |
|
Thread Tools | Display Modes |
|
![]() |
#1 |
Registered User
![]() Join Date: Feb 2007
Location: Gramercy,Louisiana
Posts: 120
|
Re: Digging Holes For Shop Today!
not 2 b nose iee but what did that cost you??
|
![]() |
![]() |
![]() |
#2 |
Designated Grumpy Old Man
![]() Join Date: Oct 2001
Location: arlington, washington usa
Posts: 3,092
|
Re: Digging Holes For Shop Today!
Only on suggestion. Put down a vapor barrier down before pouring your concrete. My contractor pulled mine up and now I pump out 8 gallons a day with a dehumifier. The cement guys will say that the concrete will not cure fast enough but the floor will sweat forever.
__________________
Never let the truth get in the way of a good story 71 Chev 1/2 ton 4X4 LWB Fleetside SOLD http://67-72chevytrucks.com/vboard/s...d.php?t=361222 http://www.youtube.com/watch?v=1LgREwtDfaA 68 Chev 1 ton flat bed http://www.youtube.com/watch?v=0bO8szzlD4A 56 Chev Handyman Wagon http://www.youtube.com/watch?v=9y-6ddpBTkM http://www.youtube.com/watch?v=lbLzZ7zY8wA 56 Chev Belair http://67-72chevytrucks.com/vboard/s...d.php?t=410667 http://www.youtube.com/watch?v=xoW0Ei7ZNIg |
![]() |
![]() |
![]() |
#3 | |
Registered User
Join Date: Feb 2007
Location: Marana, Arizona
Posts: 3,416
|
Re: Digging Holes For Shop Today!
Quote:
Did you add gravel over your site before the pour ? My fill was river run I think they called it than we added a couple inches of 5/8 crushed rock in hopes that what moisture does come up wont wick thru like it would with a dirt base.
__________________
"I feel the need for speed!"... as soon as I am done with my nap. |
|
![]() |
![]() |
![]() |
Bookmarks |
|
|