![]() |
Register or Log In To remove these advertisements. |
|
|
![]() |
|
Thread Tools | Display Modes |
|
![]() |
#1 |
Registered User
Join Date: Jan 2012
Location: Iredell, Texas
Posts: 582
|
Re: so i went and looked at this today
I think picture 3 is an electronic governor.
-Richard
__________________
I may have too many Chevys... Is that possible? ![]() 68 c50 pickup build: http://67-72chevytrucks.com/vboard/s...d.php?t=704713 |
![]() |
![]() |
![]() |
#2 |
Registered User
Join Date: May 2012
Location: horseheads,ny rust belt
Posts: 2,794
|
Re: so i went and looked at this today
went and picked up the rad and pressure over flow tank today .
then motor/trans combo was ready at local ABF terminal . next to the last parts order showed up today . just waiting on a clutch linkage piviot pin swivel . hope to start tearing in to the stuff Thursday . going to reseal / clean the tranny first since he goes in first cause I don't have a med/heavy duty style tranny jack . then it will be clean / reseal the engine and get ready for drop in .
__________________
77-k30lb BIG truck build . 87-k30lb budget beater build . 85-k30lb the plow machine build . 85-c10sb summer fun toy . ----------------------------- HOLLEY SNIPER efi = worst case of p.i.t.a i ever had . EDELBROCK pro flo 4 = best deal going so far . love my setup works great. |
![]() |
![]() |
![]() |
#3 |
Registered User
Join Date: May 2012
Location: horseheads,ny rust belt
Posts: 2,794
|
Re: so i went and looked at this today
dam used motor is junk . . . . . tore in to it to clean and re gasket / seal it and the carb throttle shaft was frozen ( 1st oh sh!t ) then trail of water down intake runner ( 2nd oh sh!t ) and pull plugs and #1 solid rust ( 3rd oh sh!t ) and bore scope down plug hole has shown SOLID RUST and NO FU*KING GOOD AT ALL ! ! !
![]() ![]() ![]() then to top it off the head guy in charge has just left yesterday on a 2 week vacation out of the country . so I have to wait on a refund on my credit card . . . .
__________________
77-k30lb BIG truck build . 87-k30lb budget beater build . 85-k30lb the plow machine build . 85-c10sb summer fun toy . ----------------------------- HOLLEY SNIPER efi = worst case of p.i.t.a i ever had . EDELBROCK pro flo 4 = best deal going so far . love my setup works great. |
![]() |
![]() |
![]() |
#4 |
Registered User
Join Date: Oct 2016
Location: Powderly Texas
Posts: 301
|
Re: so i went and looked at this today
Send your original motor to the machine shop for re-bore and have the heads reworked. You will then have a new motor that is dependable.
|
![]() |
![]() |
![]() |
#5 |
Registered User
Join Date: May 2012
Location: horseheads,ny rust belt
Posts: 2,794
|
Re: so i went and looked at this today
I don't think its even going to take that . . .
pulled a valve cover and you can basicly eat off the inside of it . my buddy bore scoped the plug holes and all but 1 super clean . 1 has tinyest bit of powdered surface rust in 1 spot. Friday its hanging on a engine stand and tearin the heads off . were going to find out the rest of the story as paul Harvey would say .
__________________
77-k30lb BIG truck build . 87-k30lb budget beater build . 85-k30lb the plow machine build . 85-c10sb summer fun toy . ----------------------------- HOLLEY SNIPER efi = worst case of p.i.t.a i ever had . EDELBROCK pro flo 4 = best deal going so far . love my setup works great. |
![]() |
![]() |
![]() |
#6 |
Registered User
Join Date: Oct 2016
Location: Powderly Texas
Posts: 301
|
Re: so i went and looked at this today
Amazon has a set of 8 pistons .030 or .060 oversize for $265.00. If you have a good block you can overhaul these fairly reasonable. Even if your bores are good, a new set of pistons will go a long way given you have new ring lands and you don't have to clean up the old pistons.
Last edited by Airdirect; 03-09-2017 at 11:57 PM. Reason: more info |
![]() |
![]() |
![]() |
#7 |
Registered User
Join Date: Mar 2013
Location: buffalo lake,mn
Posts: 11
|
Re: so i went and looked at this today
I just had a 427 rebuilt -the engine kit was about $1050.00 included pistons,,rings,bearings,timing set,oil pump,cam and lifters and gaskets.Machine work-bore .030,polish crankshaft,plane heads,valve job,and assembly was about $1075.00 . So about $2200.00 total this should give you some comparison for what a total rebuild will be.
|
![]() |
![]() |
![]() |
Bookmarks |
|
|