![]() |
Register or Log In To remove these advertisements. |
|
|
![]() |
|
Thread Tools | Display Modes |
|
![]() |
#1 | |
Senior Member
![]() Join Date: Apr 2005
Location: Cheyenne, WY
Posts: 740
|
Re: The build date project
Quote:
I looked at two of the closest dates available with a decent spread: (3-24) Z154193 and (4-28) Z163961. That is either 34 or 36 days (34 if you consider Z154193 was built at the end of the day and Z163961 was built at the beginning of the day). Using those numbers, the average is 287 trucks a day. 287 x 24 (March 1 to Mach 24) = 6888 trucks. Backing up from 3-24, the earliest for March would be Z147305. Certainly Z146839 was built in either February or March. I'll add an asterisk, ? for the month and a note. Ill bet we can make better estimates soon. Last edited by geunther; 12-11-2020 at 02:41 PM. |
|
![]() |
![]() |
![]() |
#2 |
Registered User
Join Date: Aug 2020
Location: Frisco TX.
Posts: 21
|
Re: The build date project
My 72 C10:
A149453 With my truck being an Atlanta built truck and member Pro299 truck being an Atlanta truck built 3/72, I would assume mine could possibly also have a build date of 3/72. |
![]() |
![]() |
![]() |
Bookmarks |
|
|