The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1967 - 1972 Chevrolet & GMC Pickups Message Board

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 10-31-2023, 11:13 AM   #8
pjmoreland
Senior Member

 
pjmoreland's Avatar
 
Join Date: Jan 2005
Location: CA
Posts: 7,025
Re: Van tilt intermediate shaft

Quote:
Originally Posted by custom10nut View Post
I guess I知 using the wrong word.
I知 referring to the portions that slide into each other, not the Splined end that the Rag Joint goes on.

There痴 the lower section, which is a round rod, with two machined flat sides, and it slides into the upper section, which is the Tube with the two flat sides to match the lower sections shape.
So to modify the Van tilt, am I correct in saying that the lower portion rod needs to be shorted 2 3/4 inches, opposite the splined end?
I believe vans don't use an intermediate shaft. The rag joint attaches directly to the bottom end of the upper shaft. The intermediate shaft being discussed in this thread that needs to be collapsed is a stock truck intermediate shaft.
Attached Images
 
pjmoreland is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 07:18 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
Copyright 1997-2025 67-72chevytrucks.com