Register or Log In To remove these advertisements. |
|
|
|
Thread Tools | Display Modes |
05-01-2017, 03:10 PM | #1 |
Registered User
Join Date: Jan 2016
Location: Saskatchewan
Posts: 357
|
When a 2hr job turns into a 4 day job :(
Doing rear shock relocation brackets as I've got a static drop on my '72, so I got to remove the u-bolts, and as can be expected the nuts are rustowelded on, no problem I full figured they would be, out comes the angle grinder, cut the U-bolts off and the front bolt comes out without much effort, the rear ones however, are rusty full of crud, you name it, so soak in rust penitrant for a couple days, come back, hit them with the impact, don't budge, hit them with a sledge, don't move an inch, after fighting with them for two friggen days, I am now to the point that I am going to cut the rivets on the trailing arm and seperate it just enough to get these buggers out of there. Frustrating when something that is suppose to just "be removed" eats up my time. Anyhow, rant over
__________________
1972 C10 - It might be old, but it's not slow |
05-01-2017, 03:55 PM | #2 |
20' Daredevil (Ret)
Join Date: May 2003
Location: Jefferson State
Posts: 13,728
|
Re: When a 2hr job turns into a 4 day job :(
I feel your pain. Pretty much everything I do ends up taking a whole lot more time than it should. No shop, hand tools only, limited experience, waiting for parts, you name it. Oh well, it could be a lot worse, at least I have lots of time.
__________________
- Mike - 1972 K20 LWB 350/350/205 RIP El Jay |
05-01-2017, 04:39 PM | #3 |
Restoring it $200 at a time...
Join Date: Aug 2008
Location: NE Kansas
Posts: 889
|
Re: When a 2hr job turns into a 4 day job :(
Hear ya. My first task when I got this truck was to swap the rear end. The smoke wrench was the final solution in that case.
__________________
Charter member of the 'Put the dimmer switch back on the damn floor where it belongs' Society '68 5.3L-4 speed LWB C20; grandpa bought it for the farm in '71. Now LS 5.3, rather than 327. DD '09 Pilot Weekender '65 Skylark 300-4V-4 speed Wife's '07 Lexus ES350; 117 actuator motors and I can't see the engine. Son's '04 F250 SuperCab 6.0 |
05-01-2017, 04:47 PM | #4 |
Registered User
Join Date: Jul 2015
Location: 2nd left past the stump on a dirt road.
Posts: 2,629
|
Re: When a 2hr job turns into a 4 day job :(
Hit them with PB Blasters then heat with a torch, repeat at least 3 times.
I had a piece of farm equipment that took an acetylene torch and in addition to the above I shocked it with a cold water hose after oil and heat process. I got that bugger off there! |
05-02-2017, 08:29 PM | #5 |
Registered User
Join Date: Jan 2016
Location: Saskatchewan
Posts: 357
|
Re: When a 2hr job turns into a 4 day job :(
Success! Hit it with loads of heat, and some more rust penatrant and we had movement some precision hammer work and I was good to go. Needless to say the new u-bolts will get a good coating of assembly lube.
__________________
1972 C10 - It might be old, but it's not slow Last edited by DBK81; 05-03-2017 at 10:46 AM. |
05-03-2017, 05:48 PM | #6 |
Registered User
Join Date: Nov 2007
Location: Indianapolis
Posts: 1,161
|
Re: When a 2hr job turns into a 4 day job :(
I used my "hot wrench" works every time
|
05-04-2017, 01:40 AM | #7 |
Registered User
Join Date: Jan 2016
Location: Saskatchewan
Posts: 357
|
Re: When a 2hr job turns into a 4 day job :(
Installing the actual shock relocation brackets = 15min
Removing the old rusted/welded/riveted parts = 5 full evenings Both lower shock mounts had been welded in spots to the trailing arm, friggen thing fought me the whole way. Good news is now the shocks actually do their job, ride is much better, and a quick test burnout and zero wheel hop.
__________________
1972 C10 - It might be old, but it's not slow |
05-04-2017, 01:50 AM | #8 |
Registered User
Join Date: Jun 2013
Location: West Virginia
Posts: 6,427
|
Re: When a 2hr job turns into a 4 day job :(
"Nothing takes 5 minutes."
I thought I'd have my truck running in 3 weeks....it's been 4 years now! |
05-04-2017, 08:14 AM | #9 |
Registered User
Join Date: Jun 2014
Location: Mocksville, NC
Posts: 1,766
|
Re: When a 2hr job turns into a 4 day job :(
One of my worst pitfalls on working on my truck is being overly optimistic when planning out the time it will take to finish a project. If I tell my wife I'll be done in one hour, she says ok I'll see you in 4.
__________________
Builds: Green Gus the 68 C10 | Bluey the 72 1500 | Lowly the 70 C10 - Instagram: @dr.hewitt - C10 Concept/Development Photos: Master Thread |
05-04-2017, 09:30 AM | #10 |
Registered User
Join Date: Jan 2016
Location: Saskatchewan
Posts: 357
|
Re: When a 2hr job turns into a 4 day job :(
Lol isn't that true! I'm getting to the point now that almost everything underneath has been replaced so make for less rustowelded garbage.
__________________
1972 C10 - It might be old, but it's not slow |
05-04-2017, 10:01 AM | #11 |
Registered User
Join Date: Apr 2017
Location: Gilbert, AZ
Posts: 22
|
Re: When a 2hr job turns into a 4 day job :(
I think I'll get one... sounds like a plan I can stick to...
__________________
#######________ _________|__[_____]___ |-----------|__|---[o###o] ()_)-o-()_)###()_)-o-)_) |
05-04-2017, 11:54 AM | #12 |
Registered User
Join Date: Aug 2016
Location: In the U.S., Way Up North
Posts: 180
|
Re: When a 2hr job turns into a 4 day job :(
That's why I've hardly done anything on mine Afraid if ripping something apart and having my truck stuck out on the curb and getting ticketed on street sweeping day I'm finally getting my garage together though so at least it'll be stuck in the garage
__________________
-Jim 71 Chevrolet C20 94 GMC Yukon 4x4 |
05-04-2017, 01:41 PM | #13 | |
Registered User
Join Date: Jun 2013
Location: West Virginia
Posts: 6,427
|
Re: When a 2hr job turns into a 4 day job :(
Quote:
my garage my front living room my rear living room my bedroom my parents breezeway my parents garage my backyard under a tarp a forum member's garage |
|
05-04-2017, 02:05 PM | #14 |
Registered User
Join Date: Aug 2016
Location: In the U.S., Way Up North
Posts: 180
|
Re: When a 2hr job turns into a 4 day job :(
I remember those days. Don't get me wrong, my wife is cool but she's kind of a neat freak
__________________
-Jim 71 Chevrolet C20 94 GMC Yukon 4x4 |
05-04-2017, 02:06 PM | #15 | |
Registered User
Join Date: Oct 2011
Location: Victoria, B.C
Posts: 3,794
|
Re: When a 2hr job turns into a 4 day job :(
Quote:
The end game for me is the truck pulling out of the driveway in whatever form it is in on that morning.....washed, detailed...or not....but definitely not apart...lol. All Good Coley
__________________
....for some men, there is experience, skill and effort....for the others...there is visa and UPS LOL 1966 Chevy 1/2 ton (Florida- Red/white) 1972 Chevy 1/2 ton (California- Blue/white) 2005 Chevy Silverado HD2500/Duramax 2000 Dodge Ram 1500 |
|
05-04-2017, 04:47 PM | #16 |
Senior Member
Join Date: Feb 2009
Location: Northern Nevada
Posts: 7,329
|
Re: When a 2hr job turns into a 4 day job :(
That's me. Add detail to extreme, and time in borders on pathetic. Like you say, it's because of limited experience. I buy tools as I go. I'll have approaching 1.5-2K in that just for this project.
__________________
Tony 71 Custom Deluxe, SWB, 2WD, 402, A/C. I developed an assembly kit for restoring the (a) truck from the ground up. My build thread, and more on the assembly kit https://67-72chevytrucks.com/vboard/...d.php?t=730025 |
Bookmarks |
|
|