The 1947 - Present Chevrolet & GMC Truck Message Board Network







Register or Log In To remove these advertisements.

Go Back   The 1947 - Present Chevrolet & GMC Truck Message Board Network > 47 - Current classic GM Trucks > The 1960 - 1966 Chevrolet & GMC Pickups Message Board > projects and builds

Web 67-72chevytrucks.com


 
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
Old 04-22-2018, 05:11 PM   #28
Jferrante
Registered User
 
Jferrante's Avatar
 
Join Date: Jan 2015
Location: Arlington VA
Posts: 359
Re: Project 66: LS and Frame on the Ground

Hurt my back and some other **** going on but was able to get some work done.
Cab mounts in the rear were off, moved them back and welded them up and got the cab on where it should be. All the air lines are in and not leaking. Brake lines are started as well as fuel, tank, and rear bumper. Did a small notch on the cab as well for my driveshaft.
Really wanna drive this thing sooner than later.
Jferrante is offline   Reply With Quote
 

Bookmarks


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 04:25 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.
Copyright 1997-2022 67-72chevytrucks.com